As part of the Deltaport Berth 3 Expansion, approximately 2.5 km of existing causeway was modified to improve marine habitat. The modifications involved the excavation of existing rip rap and sand fill for the construction of salt marsh channels.

Construction of sheet pile bulkhead wall, excavation of foreshore material, import via ocean barges and installation of surface aggregates; supply, installation and maintenance of plant material, placement of granular materials and asphaltic paving.

Value

$13,644,419

Year

2010

Owner

Vancouver Fraser Port Authority

Refer to

Julie Edgar (604-665-9135)

Arch./Eng.

Klohn Crippen Berger, Moffatt & Nicole

Refer to

Geoff B.A. Cooper, M.I.C.E., P. Eng. (604-251-8439), Harold C. Westerman, P. Eng. (604-613-4200)