Storm Sewer Detention Broadway Street Works Yard

 


Description

Storm Sewer Detention Broadway Street Works Yard


Details

This project was for the construction of phase 1 of a storm detention system for the City of Port Coquitlam. This included the supply and installation of manholes in the City works yard.

Supply and installation of a VortSentry HS72 manhole including wellpointing due to the depth and the existing ground water. Tie-ins to the existing 2400x1200 box culvert on Broadway street.

Value

$293,677

Year

2011

Owner

The Corporation of the City of Port Coquitlam

Refer to

Dave Currie (604-927-5205)

Arch./Eng.

CitiWest Consulting Ltd. (604-591-2213)

Refer to

John Sidnell (604-591-2213)